WaveLine® Display 20ft S-Curve
WL-G-73S
This tension fabric display is a great alternative to standard pop up back wall displays. Lightweight aluminum poles with bungee cord snap together to create the base framework, then slide on the pillowcase-like graphic over the frame and zip it closed at the bottom. The zipper is hidden from view and tightens up the stretched fabric graphic for a smooth image. Single or Double-sided.
Kit Includes
- (1) 7x3 Frame S-Curve - 1-1/4" (32mm) cold-drawn anodized aluminum
- (1) Travel bag - made from 100% recycled materials
- (1) Graphic Print - recyclable polyester stretch fabric, vibrant, wrinkle-resistant
- Single or double-sided
Add-on Accessories
- LED Light
- CA700 Case (no graphic print) or CA700 Case w/ Custom Graphic
Specifications
- Display Size: 5981mm W x 2260mm H (235.5" W x 88" H )
- Shipping Size: 420mm W x 33.5mm D x 820mm H (16.5" W x 13.2" D x 32.3" H)
- Material: Dye-sublimation Stretch Fabric
- Carton Weight: 7.2 kg, 15.9 lb
- Graphic Weight: 6.2 kg,13.6 lb
- Warranty: One (1) year on hardware and graphics.
